Skip to content

Report reason for power state change#2515

Draft
evan-oxide wants to merge 7 commits into
masterfrom
evan/report-power-state-change-reason
Draft

Report reason for power state change#2515
evan-oxide wants to merge 7 commits into
masterfrom
evan/report-power-state-change-reason

deleteme: update my branch of management-gateway-service

8acd33a
Select commit
Loading
Failed to load commit list.
buildomat / build gimlet-e succeeded May 14, 2026 in 4m 30s

Success!

The buildomat job ID is 01KRMEKC0K7YPCCF4S1G2B4J74. Click here for more detailed status.

The job produced the following artefacts:

The requested job was completed.

Details

control: job assigned to worker 01KRMEKKMRASH0JKMAY733RGEY [factory aws, i-00095f11d638822ff] (queued for 29 s)
...
task: starting task 0: "setup"
task: process exited: duration 18549 ms, exit code 0
...
task: starting task 1: "rust-toolchain"
task: process exited: duration 6301 ms, exit code 0
...
task: starting task 2: "authentication"
task: process exited: duration 3 ms, exit code 0
...
task: starting task 3: "clone repository"
task: process exited: duration 2899 ms, exit code 0
...
task: starting task 4: "build"
...
|   dtcm:      0x0 (0%)
|   sram1_mac: 0x4000 (25%)
|   sram1:     extern region (jefe, dump_agent)
|   sram2:     extern region (jefe, dump_agent)
|   sram3:     extern region (jefe, dump_agent)
|   sram4:     extern region (jefe, dump_agent)
|   bank2:     extern region (update_server)
|     *default ram region
| warning: memory allocation is sub-optimal
| Suggested improvements:
| kernel:
|   axi_sram:  6064  (currently 8192)
| + cp target/gimlet-e/dist/default/build-gimlet-e-image-default.zip /work/
| + touch /work/this_is_not_signed.txt
task: process exited: duration 184442 ms, exit code 0
|W| found 2 output files
|W| uploading: /work/build-gimlet-e-image-default.zip (5529907 bytes)
|W| uploaded: /work/build-gimlet-e-image-default.zip
|W| uploading: /work/this_is_not_signed.txt (0 bytes)
|W| uploaded: /work/this_is_not_signed.txt